top of page
futuristic-computer-network-powers-global-communications-inside-modern-factory-generated-b

DATA CENTERS

Data centers are not a combination of individual solutions, but a unified system in which all components work together in an integrated manner. Therefore, data centers and server rooms are very complex and can only be planned in an interdisciplinary manner.

Interdisciplinary BIM Design makes this possible:

the processing of project information within a unified information system;

automatic update of materials and equipment in the database every time the design status changes;

interactive analysis of the system interfaces.

о_edited.jpg

OUR EXPERTISE

01  MEP COMPETENCIES

  • Air conditioning and ventilation

  • Guaranteed and uninterruptible power supply

  • Comprehensive physical security systems

  • Systems for scheduling and managing the data centre infrastructure

  • Fire protection systems

  • Structured cabling systems

  • Heating systems, water supply, fuel supply

  • Recuperation systems (ESG approach)

​​

03  ARCHITECTURAL DESIGN

  • Measurement and creation of digital design bases

  • Preliminary design and schematic design

  • Design of additional functions: Office areas, interior design

  • Facades: Material and colour concepts, lighting

  • Masterplaning

  • Planing for building permit

​​

02  STRUCTURAL DESIGN

  • Visual assessment of the existing load-bearing structures

  • Support structure concepts (also insertion into existing support structure)

  • Assessment of the load-bearing capacity of existing structures (for extensions)

​​

04  BIM COMPETENCIES

  • BIM (Revit) - design method for all projects

  • BIM-management and BIM coordination of the project

  • Open BIM

  • BIM-based cost and quantity calculation

  • CFD-simulations to optimize energy costs

​​

PROJECTS

A Green-field Data Center

Our services: / Full Multidisciplinary Design Location: Germany Area: 16 805 m2 Capacity: 30 MW (20 MW IT) Tier class III Racks: 2 x 1200 Challenges: / New construction / High safety requirements Client: confidential

Head office of the North Rhine Association of Statutory Health Insurance Physicians with server room

Our services: / Integrated object design + electrical design / Digital design BIM (Revit), Grasshoper+Rhino for complex architectural form Location: Germany Area: 14 000 m2 Server Room: ca 200 m2 Challenges: / The building concept focuses on resource conservation and energy efficiency. / Renewable energies (geothermal energy and air/water heat pumps) are used to reduce the building's primary energy requirements. Client: Leonhard Weiss Bauunternehmung Concept: ATP Architect

Data Centre in University clinic

Our services: / MEP Location: Germany Area: 1800 m2 Capacity: 4 MW Tier class III Racks: 100 Challenges: / Conversion of a former canteen kitchen into data center / High safety requirements / Design conversion during ongoing operations / Integration into existing systems Client: confidential

Data Center (twin data center) of an industrial manufacturer

Our services: / Electrical design / Installation supervision / Commissioning Location: Germany / Area: 2 x 900 m2 / Capacity: 2 x 5 MW Tier class III / Racks: 2x640 (2x320 - design scope, 2x640 – full DC capacity) Challenges: / Upgrade to increase IT capacity / Design with AG-specific programs / High safety requirements (3 protection zones) / Integration into existing systems Client: confidential

Data Centre within the office space

Our services: / Architecture review and localization / Interior fit-out design Location: Germany Area: 26 000 m2 Capacity: 50 MW Tier class III Racks: 1296 Challenges: / An international architectural firm approached EСM to review, adapt and localise the design solutions for the ‘Data center with office space’ project / The original design was created according to British standards Client: confidential

Data Center
International Airport

Our services: / Architectural concept / Lead Design Engineer / BIM model 450 LOD Location: CIS Area: 20 000 m2 Capacity: 4.8 MW Tier class III Racks: 100 Challenges / New construction / 2 independent MEP systems / Coordination of 27 BIM submodels with 176,000 individual elements Client: confidential
bottom of page